{
  "project": "CEWRI / NARC Plot C2(6) regenerative agriculture water-management plan",
  "author": "Rohail Khalid / Pulse Hatch",
  "revision": "Rev12",
  "updated": "2026-10-24",
  "status": "Planning presentation; not for construction",
  "planning_area_acres": 10,
  "zone_labels": [
    "ZONE 1",
    "ZONE 2",
    "ZONE 3",
    "ZONE 4"
  ],
  "zone_planning_area_acres": 2.5,
  "crop_assignments": null,
  "planning_dimensions_ft": {
    "AB": 570,
    "BC": 800,
    "CD": 570,
    "AD": 800
  },
  "half_dimensions_ft": {
    "AB_CD": [
      285,
      285
    ],
    "AD_BC": [
      400,
      400
    ]
  },
  "path_clear_width_ft": 12,
  "green_strip_each_side_ft": 2,
  "contours": {
    "interval_ft": 1,
    "relative_labels_ft": [
      0,
      1,
      2,
      3,
      4,
      5,
      6
    ],
    "approximate_source_relief_ft": 6.7,
    "zero_reference": "Arbitrary local presentation reference, not a surveyed benchmark",
    "basis": "Interpolated terrain-model reference; collected dumpy-level readings not yet reconciled",
    "interval_is_survey_accuracy": false
  },
  "existing_channel": {
    "reported_difference_ft": 2.2,
    "higher_or_lower": null,
    "status": "Sign, endpoints and datum require field verification"
  },
  "tank_proposal": {
    "plan_ft": [
      10,
      16
    ],
    "height_ft": 4,
    "status": "Concept; hydraulics unverified"
  },
  "water_routes": "Separate irrigation and drainage proposals retained from source KMZ",
  "limits": [
    "Side lengths and zone areas are client planning labels, not a closed cadastral traverse.",
    "Contour interval is a display choice, not a survey accuracy claim.",
    "Hydraulic feasibility, finished levels, pump or pipe sizing and construction outcomes are not verified."
  ],
  "downloads": {
    "case_study_pdf": "/assets/ten-acre-regenerative-water-plan.pdf",
    "map_pdf": "/assets/ten-acre-water-plan-rev12.pdf",
    "google_earth_kmz": "/assets/ten-acre-water-plan-rev12.kmz"
  }
}
